Friday, 1 June 2012

This week saw us achieve our target of the installation of the Block and Beam to Block 1. To achieve this we repositioned the crane in the lay-by outside our site boundary. This meant a temporary traffic management system and a tight delivery schedule was introduced, this process went like clockwork. We also installed the internal drainage to Block 2. So next week we can proceed with the Gas Proof Membrane and Internal Walls.