Tuesday, 28 August 2012

Last week saw us top-out to the road elevation.  The front doors are now installed and the brickwork is progressing nicely to the 1st lift.
 
The internal ceilings and perimeter walls to the 1st floor are now complete, and whilst the acoustic floors are being installed we can board the ground floor ceilings and perimeter walls.
 
We recharged our batteries over the Bank Holiday weekend and have come back raring to go...!
 

 

Monday, 20 August 2012

Last week saw us progress the masonry to the road elevation almost up to the eaves.  This should be completed this week. The front doors are being delivered and installed this week, which will enable us to continue with the masonry to the front elevation.

The internals are picking up pace.. we are plaster boarding the 1st floor perimeter walls, and taping and jointing. This will be followed by the installation of the acoustic floors.   



Monday, 13 August 2012

Last week we took full advantage of the better weather, progressing the masonry up to the 1st scaffold lift.  The scaffolders will then come and deck out the 1st lift and higher the loading bays.
 
Internally we plaster boarded the 1st floor ceilings, following on we will be plaster boarding the walls.
 
A good weeks' progress made... matched only by our local Olympians - if we put Yorkshire in the medal table we would be above Australia ! 
 


 

Monday, 6 August 2012

Last week we felted and battened Block 2, carrying on with tiling the roof and at the same time loading and tiling block 1. The gable ends of the roof will have to be completed once the outer brick/stone skin as been brought up to give the exact line to finish the tiles to.  With the roofs loaded out earlier on in the week we commenced the masonry to the gable and road elevation to block 1.  Internally we fitted the staircases, which allowed access to insulate the party walls and ground floor ceilings and installation of the windows. This will allow us this week to commence with plasterboarding the ceiling and walls, starting on the 1st floor. 
 
Last week our efforts were matched by Team GB with a Gold medal frenzy seeing us shoot above Kazakhstan in the league table !