Last week saw us top-out to the road elevation.  The front doors are now installed and the brickwork is progressing nicely to the 1st lift.
 
The internal ceilings and perimeter walls to the 1st floor are now complete, and whilst the acoustic floors are being installed we can board the ground floor ceilings and perimeter walls.
 