Last week we felted and battened Block 2, carrying on with tiling the roof and at the same time loading and tiling block 1. The gable ends of the roof will have to be completed once the outer brick/stone skin as been brought up to give the exact line to finish the tiles to.  With the roofs loaded out earlier on in the week we commenced the masonry to the gable and road elevation to block 1.  Internally we fitted the staircases, which allowed access to insulate the party walls and ground floor ceilings and installation of the windows. This will allow us this week to commence with plasterboarding the ceiling and walls, starting on the 1st floor. 
 