Monday, 20 August 2012

Last week saw us progress the masonry to the road elevation almost up to the eaves.  This should be completed this week. The front doors are being delivered and installed this week, which will enable us to continue with the masonry to the front elevation.

The internals are picking up pace.. we are plaster boarding the 1st floor perimeter walls, and taping and jointing. This will be followed by the installation of the acoustic floors.