Friday, 13 July 2012

This week saw continuing work from last Friday when the crane lifted the trusses onto the 1st floor.  The team setting out, erecting and bracing trusses on the 1st floor to Blocks 1 and 2.  They will be lifted off and 1st floor, wall panels lifted into place. Then the roof trusses sat on the wall plate.